TB0-108:TIBCO iProcess Modeler 10 Exam

  • 887
  • 0

摘要:TB0-108:TIBCO iProcess Modeler 10 Exam

Tibco Software Certification TB0-108考試題庫由TestPassPort資深IT認證講師和Tibco Software Certification產品專家結合PROMETRIC或VUE的真實TB0-108考試環境最新原題傾心打造。

Competitive advantage isn’t about size anymore. It’s about giving customers what they want, how they want it, when they want it.

TIBCO delivers The Power of Now® with integration software that connects incompatible IT assets, process management software that orchestrates systems and people, and a range of other software products that enable the real-time processing and presentation of information. With over 20 years of experience in mission-critical environments, TIBCO is synonymous with extreme performance, scalability, and reliability. 47 of the world’s top 100 companies, including giants like Delta Air Lines, FedEx, Merrill Lynch, and Telecom Italia are TIBCO customers.

1. Click the Exhibit button.

Where should a Transaction Control step be added so that the Status step is delivered if there is an error processing the EAI steps?
A.before the Status step, to ensure that the step is sent out
B.before the Withdraw step, to catch a failure in the sequence of EAI steps
C.before the Start step, to control the transaction after the step is released
D.after the Balance step, to control the transaction if one of the EAI steps fails
Answer: B

2. When a step is the first object in a procedure, which action presents the workitem instantly to the user performing a manual case start?
A.use SW_STARTER as the addressee
B.use a Complex Router before the first step
C.use a group as an addressee for the first step
D.use a process field to capture the User ID and use it as a dynamic address
Answer: A